Post-construction evaluation of the new juvenile bypass system and guidance screen modifications at John Day Dam, 1998

by Randall F. Absolon

Publisher: Fish Ecology Division, Northwest Fisheries Science Center, National Marine Fisheries Service in Seattle, Wash

Written in English
Published: Pages: 36 Downloads: 600
Share This

Subjects:

  • Fish screens -- John Day Dam (Or. and Wash.) -- Evaluation.,
  • Fish screens -- John Day Dam (Or. and Wash.) -- Design and construction.,
  • Fishways -- John Day Dam (Or. and Wash.) -- Evaluation.,
  • Diversion structures (Hydraulic engineering) -- Environmental aspects -- John Day Dam (Or. and Wash.),
  • Fishes -- Effect of dams on -- John Day Dam (Or. and Wash.),
  • Steelhead (Fish) -- Columbia River -- Migration.,
  • Pacific salmon -- Columbia River -- Migration.

Edition Notes

Post-construction evaluation of the new juvenile bypass system and guidance screen modifications at John Day Dam, 1998 by Randall F. Absolon Download PDF EPUB FB2